Posts

Showing posts with the label Ali Aldimshawy

Abidu: The Lost One — A Gripping Novel of Identity, Loyalty, and the Price of Return

Image
  “The hardest thing facing any Abidu is to remain constantly aware of where he ought to return.” In 2004, inside a freezing solitary cell at Ain al-Asad Air Base in Iraq, Dr. Lassen Ismed Ano—an Assyrian-born, American-educated structural engineer and successful businessman—sits blindfolded and chained . Accused of high treason and selling weapons during wartime, he faces relentless CIA interrogators determined to extract a confession . Yet for Lassen, the interrogation room is only the latest battleground in a lifetime spent caught between two worlds, two homelands, and the weight of a family legacy he never asked to carry . In my novel, Abidu: The Lost One (the newly released English edition of my original Arabic novel) , I weave a sweeping multi-generational saga spanning Kirkuk, Baghdad, London, Cairo, Upper Egypt, San Diego, and Washington, D.C. —exploring what happens when a man belongs everywhere and nowhere at once . A Story of Exile, Memory, and Unbroken Devotion T...

Project Planning and Control Case Study: Red Zones, Green Zones, and Subcontractor Dynamics ($26M Overrun Analysis)

Image
Originally written in April 2009—and later expanded into my full practitioner manual, The $26 Million Oops: A Comprehensive Case Study on Modern Project Planning, Control, and Subcontractor Execution Dynamics —this two-part case study examines why mega-projects fail at the governance level even when field workmanship is solid. Part 1: The Entertainment & Sports Arena — Anatomy of a $26 Million Overrun On July 1, 1997, construction began on the Entertainment and Sports Arena in North Carolina with a planned completion date of September 1, 1999, and an approved budget of $120 million . By handover, the schedule had slipped six months to March 2000, and final costs had escalated to $158 million —a $26 million overrun driven by systemic failures across core project management disciplines. By screening the project against Tom Mochal’s classic project management pitfalls, we can separate what failed ( Red Zones , ranked from highest to lowest impact) from what worked ( Green Zone...